Dam, Reservoir & Intake 3D Surveys

3D digital models of freshwater intake towers, spillways, and hydro-turbine trash racks, without putting divers into hazardous flows.

Overview

What This Involves

Intake towers, spillway faces, and turbine trash racks sit in flow conditions that make diver inspection genuinely hazardous — intake suction and spillway discharge are exactly the environments remote survey exists for. We generate full 3D digital models of the submerged structure using ROV-based photogrammetry and sonar, giving the operator an inspection record without putting a person into the water near an active intake or spillway.

Method

How It's Done

01

Flow and hazard assessment to confirm remote survey approach and any required shutdown/isolation coordination

02

ROV-based photogrammetric and sonar survey of the intake, spillway, or trash rack structure

03

3D reconstruction of the submerged structure

04

Findings reported against the operator's asset integrity programme

Output

Deliverable

A 3D model of the submerged intake, spillway, or trash rack structure, captured without diver exposure to hazardous flow.

Fit

Who It's For

Hydro operators and reservoir authorities with a diver-hazardous inspection requirement.

Frequently Asked
What does Dam, Reservoir & Intake 3D Surveys involve?

Intake towers, spillway faces, and turbine trash racks sit in flow conditions that make diver inspection genuinely hazardous — intake suction and spillway discharge are exactly the environments remote survey exists for. We generate full 3D digital models of the submerged structure using ROV-based photogrammetry and sonar, giving the operator an inspection record without putting a person into the water near an active intake or spillway.

How does it work?
  1. Flow and hazard assessment to confirm remote survey approach and any required shutdown/isolation coordination
  2. ROV-based photogrammetric and sonar survey of the intake, spillway, or trash rack structure
  3. 3D reconstruction of the submerged structure
  4. Findings reported against the operator's asset integrity programme
What's the deliverable?

A 3D model of the submerged intake, spillway, or trash rack structure, captured without diver exposure to hazardous flow.

Who is Dam, Reservoir & Intake 3D Surveys for?

Hydro operators and reservoir authorities with a diver-hazardous inspection requirement.