Port, Marina & Civil InfrastructureItaly

Dam, Reservoir & Intake 3D SurveysGenoa

Intake towers, spillway faces, and turbine trash racks sit in flow conditions that make diver inspection genuinely hazardous — intake suction and spillway discharge are exactly the environments remote survey exists for. We generate full 3D digital models of the submerged structure using ROV-based photogrammetry and sonar, giving the operator an inspection record without putting a person into the water near an active intake or spillway.

Why it matters in Genoa

Italy's largest port by cargo volume and a historic shipbuilding and repair hub, home to the classification society RINA.

A working port with this much vessel traffic and repair activity generates a steady, genuine need for in-water hull survey, class inspection support, and quay condition monitoring — not a one-off requirement.

Deliverable

A 3D model of the submerged intake, spillway, or trash rack structure, captured without diver exposure to hazardous flow.

Full step-by-step methodology on the Dam, Reservoir & Intake 3D Surveys overview — the same process, run out of the Genoa area.

Working in the Genoa area

If there's a dam, reservoir & intake 3d surveys requirement in the Genoa area — a single job or an ongoing programme — get in touch to discuss scope and timing.